- Design-Assist 6-story Hotel and 180,000 SF Casino
- Over $1M value-engineered savings
- 4 months duration, a schedule saving of 3 months
 

 

 

Roel came to us with high expectations and an aggressive building schedule. They wanted up-front guaranteed pricing and help through the design phase to reduce the overall cost of the project. The remote location and demanding environmental conditions of this project in Yuma, AZ presented additional challenges.

The in-house design-assist precon service provided on-the-spot structural input and our in-house structural engineers were able to quickly trouble-shoot constructability issues. By redesigning and engineering structural components, the team was able to produce a design that was more efficient in both material usage and schedule to construct – all while cutting over $1 million off the budget.