CityCenter - Las Vegas, NV

 

 

 

For CityCenter T.B Penick/ Triton collaborated with the MGM Mirage Design Group, landscape architects and contractor to create the decorative concrete walls of casino circle and adjoining water displays as well as the majority of the project's exterior flatwork.

Penick/Triton installed over 10,000 yards of concrete, 480,000 SF Flatwork, which includes glass seeded Lithocrete, Bomanite imprint, and integral and gray broom finish concrete, and 10,000 Lf of pour-in-place walls, form liner and smooth finish walls, with majority of the work was completed within six months.